Marine and Naval Engineering Explanation

Mooring Systems for Floating Structures Explained

Mooring Systems for Floating Structures Explained: featured diagram
Short answer

Mooring systems are arrangements of lines, connectors and anchors that keep a floating structure on station against wind, waves and current. Lines of chain, steel wire or synthetic fibre run from fairleads on the hull to seabed anchors. Catenary lines resist through their weight; taut lines resist through their elastic stretch.

Mooring systems hold semi-submersibles, spars, FPSOs, floating wind turbines and loading buoys within a small circle above their wells, risers or cables. A floating structure has no stiffness of its own in the horizontal plane, so the mooring alone supplies the restoring force when the weather pushes it off position. The floater types themselves are compared in fixed vs floating offshore structures.

Watch: How mooring systems work in 18 seconds

What mooring systems do

Environmental loads on a floater come in three parts. Wind, current and wave drift produce a mean force that pushes the vessel to a steady offset. Waves also cause motions at wave frequency, and slowly varying wave drift and wind gusts cause large low frequency motions near the natural period of the moored system. The mooring has to limit the offset so that risers and cables are not overstressed, and it has to carry the resulting line tensions with an adequate safety factor.

As the floater moves off position, the lines on the weather side tighten and those on the lee side slacken. The difference in their horizontal tensions is the restoring force, and the line type decides how fast it grows with offset.

Wind, waves, currentFloaterSea surfaceFairleadFairleadChain catenaryTaut synthetic ropeTouchdown pointDrag anchorSuction anchorSeabedWaterdepth
A catenary line resists through its weight and lies on the seabed at the anchor. A taut line runs straight to an anchor that can take an upward pull and resists through stretch.
Download diagram (WebP)

Types of mooring systems

Spread mooring

Groups of lines run from several fairleads around the hull, often from each corner of a semi-submersible or spar. The vessel keeps a fixed heading. Spread moorings suit structures that are not sensitive to the direction of the weather, and FPSOs in sites where the weather comes mostly from one direction.

Turret mooring

All lines connect to a turret, either built into the hull (internal) or cantilevered off the bow (external), on a large bearing. The ship rotates around the turret and weathervanes to face the weather, which keeps loads on a ship shaped FPSO low in harsh environments. Risers pass up through the turret and a swivel.

Single point mooring buoy

A catenary anchor leg mooring (CALM) buoy is held by several lines and a tanker moors to it with a hawser, rotating around it while it loads or discharges crude oil.

Tendons

A tension leg platform is held by vertical steel tendons kept in tension by the platform’s excess buoyancy. The tendons stop almost all heave, pitch and roll, which is different from conventional moorings that only control horizontal offset.

Catenary vs taut mooring systems

FeatureCatenary mooringTaut leg mooring
Line materialChain, or chain with steel wireSynthetic fibre such as polyester, with chain at each end
Source of restoring forceWeight of the hanging line, which lifts off the seabed as the vessel movesElastic stretch of the line
Line at the anchorLies on the seabed, so the pull is horizontalMeets the seabed at an angle, with a vertical pull component
Anchor typeDrag embedment anchor or pileSuction anchor, pile or vertically loaded anchor
Seabed footprintLarge, line length several times water depthSmaller
Best suited toShallow to moderate depthsDeep and ultra deep water

A catenary line stores energy by lifting more of its own weight off the seabed as the floater moves away, so its stiffness rises steeply with offset. In deep water a steel catenary becomes very heavy, and the line spends much of its strength holding up its own weight. Polyester is nearly weightless in water, so a taut polyester line keeps the vertical load on the floater low and its stretch provides the stiffness. API RP 2SM covers the design, testing and installation of these fibre ropes. Many systems mix both, with buoys or clump weights added to tune the stiffness.

Mooring line components and anchors

Chain is rugged and resists abrasion on the seabed, so it is used in the touchdown zone and at the fairlead, where the line passes through chain stoppers and winches. It comes in studlink and studless forms. Steel wire rope, either six strand or spiral strand, is lighter than chain for the same strength and is used in the middle of long lines. Synthetic fibre ropes are used in taut and semi-taut systems. Connectors such as shackles and special links join the segments, and types of corrosion and wear are allowed for in the design life.

Anchor choice follows the load direction and the soil. Drag embedment anchors are dragged into the seabed by the line and hold large horizontal loads in clay and sand, but little vertical load. Suction anchors are large steel cylinders sunk into soft soil by pumping water out of the top; they resist both horizontal and vertical loads. Driven piles and vertically loaded anchors also take uplift, and gravity anchors rely on their own weight.

Catenary equations for a mooring line

For a line of submerged weight w per unit length, with the lower end lying tangent to the seabed and elastic stretch neglected, Faltinsen gives the static catenary relations. With horizontal tension T_H, define a = T_H ÷ w. Then:

ls=h1+2ahl_s = h \sqrt{1 + \frac{2a}{h}} x=acosh⁡−1(1+ha)x = a \cosh^{-1}\left(1 + \frac{h}{a}\right) T=TH+whT = T_H + w h

where h is the vertical distance from the fairlead to the seabed, l_s the suspended length, x the horizontal distance from the fairlead to the touchdown point and T the line tension at the fairlead. The vertical component of fairlead tension equals the weight of the suspended line, w l_s.

Worked example
Given
A chain catenary line with submerged weight w = 1.3 kN/m. The fairlead is h = 200 m above the seabed and the horizontal tension in the mean position is T_H = 1000 kN.
Find
The suspended length, the horizontal distance to the touchdown point, the fairlead tension and its angle, and the minimum breaking strength needed against the API RP 2SK intact quasi-static factor.
Assumptions
Static catenary, inextensible line, lower end tangent to a flat seabed. This tension is treated as the maximum quasi-static tension, and the API RP 2SK intact quasi-static safety factor of 2.00 applies.
Solution
a = 1000 ÷ 1.3 = 769.2 m
l_s = 200 × √(1 + 2 × 769.2 ÷ 200) = 200 × √8.692 = 589.7 m
x = 769.2 × cosh⁻¹(1 + 200 ÷ 769.2) = 769.2 × cosh⁻¹(1.260) = 769.2 × 0.7063 = 543.3 m
T = 1000 + 1.3 × 200 = 1260 kN
Vertical component = 1.3 × 589.7 = 766.6 kN; angle above horizontal = tan⁻¹(766.6 ÷ 1000) = 37.5°
Minimum breaking strength ≥ 2.00 × 1260 = 2520 kN
Answer
About 590 m of line hangs free, touching down 543 m from the fairlead, with a fairlead tension of 1260 kN at 37.5° to the horizontal. The line needs a minimum breaking strength of at least 2520 kN for this tension.
Limitations
The mean position is not the design case. A real design finds the tension at the maximum offset in the design storm, adds wave frequency and low frequency dynamics, includes line stretch, and checks the damaged condition with one line broken.

Key formulas for mooring systems

QuantityFormulaSymbols and units
Catenary parametera = T_H ÷ wT_H in kN, w = submerged weight in kN/m, a in m
Suspended lengthl_s = h × √(1 + 2a ÷ h)h = fairlead height above seabed in m
Horizontal distance to touchdownx = a × cosh⁻¹(1 + h ÷ a)x in m
Fairlead tensionT = T_H + w × hT in kN
Vertical tension at fairleadT_V = w × l_sT_V in kN
Safety factorSF = MBS ÷ T_maxMBS = minimum breaking strength, T_max = maximum line tension, both in kN

Design checks for mooring systems

API RP 2SK and ISO 19901-7 require the mooring to be checked in the intact condition, in the damaged condition with one line broken, and in the transient condition just after a line breaks. API RP 2SK sets safety factors on minimum breaking strength. For intact lines they are 2.00 with quasi-static analysis and 1.67 with dynamic analysis. For one line damaged they are 1.43 and 1.25. ISO 19901-7 frames the same checks as ultimate, accidental and fatigue limit states.

Fatigue matters because a mooring sees millions of wave cycles over its life; the mechanism is explained in fatigue failure. Corrosion and wear of chain near the splash zone and the touchdown point are allowed for in the design. Anchors are checked separately against their holding capacity. Once installed, lines are inspected by ROV, and many floaters carry tension monitoring at the fairleads. Lines also change the floater’s weight and stability, discussed in ship stability basics, and in-field pipelines and risers on offshore platforms set the limit on allowable offset.

Mooring systems interview and viva questions

  1. How does a catenary line provide restoring force? As the floater moves away, more of the heavy line lifts off the seabed, and the extra suspended weight increases the horizontal tension pulling the floater back.
  2. Why are drag embedment anchors used with catenary moorings? The line lies on the seabed at the anchor, so the anchor is pulled horizontally, which is the load these anchors are designed to resist.
  3. Why do taut moorings need suction anchors or piles? The line meets the seabed at an angle, so the anchor has to resist an upward pull as well as a horizontal one.
  4. What is the fairlead tension of a catenary line? It equals the horizontal tension plus the submerged weight per unit length times the fairlead height above the seabed, T = T_H + wh.
  5. What load cases does API RP 2SK check? Intact, damaged with one line broken, and transient after a line break, with safety factors of 2.00 and 1.67 intact and 1.43 and 1.25 damaged for quasi-static and dynamic analysis.

Frequently asked questions

Why do deepwater moorings use polyester rope instead of chain?

In deep water a steel line becomes very heavy, and much of its strength is used to carry its own weight. Polyester is almost weightless in water and its stretch provides the restoring force, so a taut polyester line needs a smaller seabed footprint and adds less vertical load to the floater.

What is the difference between a spread mooring and a turret mooring?

A spread mooring holds the vessel at a fixed heading with lines from several points around the hull. A turret mooring connects all lines to one turret, and the vessel rotates around it to face the weather, which reduces environmental loads on ship shaped hulls.

Does a catenary anchor take vertical load?

In a correctly designed catenary mooring, part of the line lies on the seabed at the anchor, so the anchor is pulled horizontally. This is why drag embedment anchors suit catenary systems, while taut systems need anchors such as suction piles that can resist an upward pull.

References

  1. API RP 2SK, Design and Analysis of Stationkeeping Systems for Floating Structures, 3rd ed., American Petroleum Institute, 2005
  2. ISO 19901-7:2013, Petroleum and natural gas industries, Specific requirements for offshore structures, Part 7: Stationkeeping systems for floating offshore structures and mobile offshore units
  3. API RP 2SM, Design, Manufacture, Installation, and Maintenance of Synthetic Fiber Ropes for Offshore Mooring, 2nd ed., American Petroleum Institute, 2014
  4. O. M. Faltinsen, Sea Loads on Ships and Offshore Structures, Cambridge University Press, 1990
  5. S. K. Chakrabarti (ed.), Handbook of Offshore Engineering, Vols 1 and 2, Elsevier, 2005

Get one engineering email a week

New articles, worked examples and study notes every week. Free, no spam, unsubscribe any time.

Zenta Engineering

Articles written by the Zenta Engineering editorial staff are checked by our technical team against the references listed on each page, following our editorial policy. Editorial policy.

Related articles